Systematic and standardized process
From service to shipment, it is safer and more efficient
From service to shipment, it is safer and more efficient
From initial consultation to program design, on-site visits, and then to later stocking and shipment, after-sales complaint feedback, etc., Jinghua has built a complete system to effectively ensure that information is conveyed in a timely and efficient manner, ensuring that the right people provide our company's most professional services and technical support at the right time.

- 30MINReply to technical consultation
- 24HRSProvide clear solution design
- 72HRSCompleted engineer dispatch
- 24MINCompletely resolve complaints and feedback
Four major links ensure safe and efficient equipment preparation and transportation
Professional installation, commissioning and operation to ensure successful acceptance of the production line
01
Installation preparation stage
Check and confirm the order, check the parts required by the equipment, measure and compare the elevation and geometric size according to the drawings
02
Equipment installation phase
Plan the on-site installation according to the design diagram, and gradually install the equipment and related supporting devices
03
Equipment test run stage
Further check the equipment and carry out debugging and maintenance before use to ensure that the operating characteristics of the equipment meet the needs of production
04
Equipment acceptance phase
JingHua is responsible for the training of relevant personnel, when all the project indicators meet the standard, you will issue the acceptance certificate
Three Guarantees to ensure the quality of your purchase
- Three guarantees clauseProduct implementation of three guarantees, the warranty period of six months, excluding wearing parts. (Note: The three guarantees of the product refer to the repair, replacement and return of the product due to quality problems.) The direct expenses within the scope of the three guarantees, such as freight, spare parts, accommodation and travel expenses of the three guarantees of technical personnel, shall be borne by Party B or refunded by the loan in this contract. Party A shall not bear the above expenses and indirect losses and expenses other than the loans hereunder. Party A shall send technical personnel to guide the installation and commissioning, and Party B shall be responsible for the accommodation of technical personnel.
- One year warrantySince the date of acceptance, the user enjoys a one-year free warranty service for the whole machine with the invoice and warranty certificate, that is, the maintenance costs generated by the maintenance caused by the quality problems of the unit itself under normal use of the equipment during the warranty period are borne by Weifang JingHua Powder Engineering Equipment Co., LTD.